Populating the Electricity Commission Registry.
1. Distributor Price Category
The Distributor Price Category field will be populated with Electricity Ashburton's Pricing option for that particular Customer Group / Connection capacity. When the ICP is initially created on the Registry, the Price Category will be "POA" as at this stage the Price Category is unknown. Once the Price Category information becomes available, the Price Category will be updated. Any enquiries regarding the price category can be emailed to:
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
The table below details the current codes that will be used:
|
Category code
|
Price Category |
Connection Description |
|
GS05
|
General Supply
less than 5kVa
|
Un-metered Temporary Supplies Single phase
less than 30amp
|
|
GS20
|
General Supply
20 kVA
|
Maximum of Single phase 63amp or
Three phase 30amp
|
|
GS50
|
General Supply
50 kVA
|
Three phase 31-63amp
|
|
G100
|
General Supply
100 kVA
|
Three phase 64-160amp
|
| G150 |
General Supply 150 kVA
|
Three phase 161amp or greater
|
| ISCH |
Irrigation
|
Connected kW Rating of Irrigation Pump held in
Distributor Chargeable Capacity Field
|
|
ICMD
|
Industrial 400V Supply
kVA
|
Maximum Demand Metering
Connected to the 400V Network
|
|
ICMK
|
Industrial 400V Supply
kW
|
Maximum Demand Metering
Connected to the 400V Network
( Pricing option closed )
|
|
ICDS
|
Industrial Direct Supply
kVA
|
Maximum Demand Metering
Not connected to the 400V Network
|
|
ICDK
|
Industrial Direct Supply
kW
|
Maximum Demand Metering
Not connected to the 400V Network
( Pricing option closed )
|
|
ICDYMD
|
Direct Supply
Day Demand
|
Maximum Demand Metering
Not connected to the 400V Network Day Demand
|
|
ICDPD
|
Direct Supply
Peak Demand
|
Maximum Demand Metering
Not connected to the 400V Network Peak Demand
|
| LUCM |
CMP
|
Canterbury Meat Packers
|
| LUPP |
PPCS
|
PPCS Ltd
|
| LUMH |
Mt Hutt Ski Area
|
Mt Hutt Ski Area
|
| LUHB |
Highbank
|
Highbank Generation
|
| LUMO |
Montalto
|
Montalto Generation
|
| MCSL |
Street Lighting
|
Street Lighting
|
| POA |
Price on Application
|
Un-known or Ambiguous pricing.
Details of these ICPs available by
sending a list of ICPs to
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
|
2. Loss Factors
Current Loss Factors have a single factor that applies 24 hours per day. All Low Voltage sites have the same loss factor (L01) however Medium and High Voltage sites have individually allocated values. Current values and codes to be used in the population of the Distribution Loss Category field are listed in the following table:
| Loss Category |
Description |
Loss Factor |
|
|
|
Consumption |
Generation |
| L01 |
Low Voltage (230/400V) |
1.073 |
1.000 |
| M01 |
Medium Voltage (11/22 kV) |
1.036 |
1.000 |
| M02 |
Medium Voltage (11/22 kV) |
1.030 |
1.000 |
| M03 |
Medium Voltage (11/22 kV) |
1.079 |
1.000 |
| M04 |
Medium Voltage (11/22 kV) |
1.048 |
1.000 |
| M05 |
Medium Voltage (11/22 kV) |
1.000 |
1.000 |
| H01 |
High Voltage (66 kV) |
1.000 |
1.020 |
| U01 |
Upper Rakaia Embedded Network (230/400V) |
1.013 |
1.013 |
3. Distributor Chargable Capacity